South East Contractors Ltd completed an external containment and power upgrade for commercial client Campus Infrastructure.

Client: Campus Infrastructure

Sector: Commercial


Project Summary


South East Contractors Ltd completed an external containment and power upgrade for commercial client Campus Infrastructure. The project involved the installation of a 150 mm² SWA supply between two new MCCB panels, providing a robust and compliant power connection as part of wider infrastructure improvements.


Scope of Works


• Installation of an external galvanised ladder rack system from ground level to roof

• Colour-matching selected ladder rack sections to blend with the building’s external cladding

• Installation, cleating, and termination of a 150 mm² SWA cable between MCCB panels

• Full testing, inspection and certification


Key Challenges & Solutions


External Installation and Aesthetics


• Ladder rack routed up the building façade and across the roof

• Selected sections sprayed black to maintain a clean appearance and match existing cladding


Heavy Cable Handling and Termination


• Safe lifting and positioning of the 150 mm² SWA

• Accurate termination into MCCB panels to meet specification and compliance requirements


Project Outcome


The project was delivered safely, to programme and in full accordance with the client’s specification. The completed installation provides a reliable and professionally finished power supply, with external containment that is both durable and visually consistent with the building’s exterior. The client received full certification, confirming compliance and readiness for operation.